James T. 'Nate' Nathan / Sean Gillespie
2087
Future development of the site will access the City’s water system via a connection to an existing 16” water line in Van Buren Street and a secondary connection to a 12” water line being installed in Corporate Drive by the developer of Fairway 10 (formerly Avondale 50). Sewer service to the site will be accommodated by an existing 30” main line in Van Buren Street. Salt River Project (SRP) provides electrical service to this portion of the City.